Solutions
For offices with chilled beams
Increase Comfort, Reduce Costs and Carbon Footprint
Problems we solve:
- Some beam buildings in Poland function significantly below the expectations of users and investors. The most common problems include condensation on the exchangers, which cuts off the cold, lack of cooling power, incorrect room temperatures, feeling of stuffiness, and local noise and drafts.
Implementation:
-
Analysis/audit of the current state of ventilation and air conditioning
We conduct a detailed analysis of the current state of ventilation and air conditioning in offices with chilled beams, identifying potential problems and optimization opportunities.
-
Preparation of a repair/optimization plan
Based on our analysis, we prepare a system repair and optimization plan, along with a cost estimate and calculation of potential energy benefits
-
Carrying out the work as planned
We implement the repair and optimization plan, carrying out necessary work, such as sealing ventilation ducts, adjusting the ventilation system, carrying out measurements and other
-
HVAC installation service contract
Once the work is completed, we offer an HVAC service contract that includes regular inspections and maintenance to ensure the long-term efficiency and reliability of the system
Contact us and arrange a free consultation with our expert. We will help you diagnose the problem and propose effective solutions